The ashing furnaces LV 3/11 - LVT 15/11 are especially designed for ashing in the laboratory. A special air intake and exhaust system allows air exchange of more than 6 times per minute. Incoming air is preheated to ensure a good temperature uniformity.
- Tmax 1100 °C
- Heating from two sides
- Ceramic heating plates with integral heating element which is safeguarded against fumes and splashing, and easy to replace
- Air exchange of more than 6 times per minute
- Good temperature uniformity due to preheating of incoming air
- Insulation made of non-classified fiber material
- Housing made of sheets of textured stainless steel
- Dual shell housing for low external temperatures and stability
- Optional flap door (LV) which can be used as work platform or lift door (LVT) with hot surface facing away from the operator
- Solid state relays provide for lownoise operation
- Defined application within the constraints of the operating instructions
- NTLog Basic for Nabertherm controller: recording of process data with USB-flash drive
Additional equipment
- Over-temperature limiter with adjustable cutout temperature for thermal protection class 2 in accordance with EN 60519-2 as temperature limiter to protect the furnace and load
- Process control and documentation via VCD software package for monitoring, documentation and control
Model | Tmax | Inner dimensions in mm | Volume | Outer dimensions in mm | Connected | Electrical | Weight | Minutes |
Flap door | °C | w | d | h | in l | W | D | H1 | load kW | connection* | in kg | to Tmax2 |
LV 3/11 | 1100 | 160 | 140 | 100 | 3 | 385 | 360 | 735 | 1.2 | 1-phase | 20 | 120 |
LV 5/11 | 1100 | 200 | 170 | 130 | 5 | 385 | 420 | 790 | 2.4 | 1-phase | 35 | 120 |
LV 9/11 | 1100 | 230 | 240 | 170 | 9 | 415 | 485 | 845 | 3.0 | 1-phase | 45 | 120 |
LV 15/11 | 1100 | 230 | 340 | 170 | 15 | 415 | 585 | 845 | 3.5 | 1-phase | 55 | 120 |
Model | Tmax | Inner dimensions in mm | Volume | Outer dimensions in mm | Connected | Electrical | Weight | Minutes |
Lift door | °C | w | d | h | in l | W | D | H1 | load kW | connection* | in kg | to Tmax2 |
LVT 3/11 | 1100 | 160 | 140 | 100 | 3 | 385 | 360 | 735 | 1.2 | 1-phase | 20 | 120 |
LVT 5/11 | 1100 | 200 | 170 | 130 | 5 | 385 | 420 | 790 | 2.4 | 1-phase | 35 | 120 |
LVT 9/11 | 1100 | 230 | 240 | 170 | 9 | 415 | 485 | 845 | 3.0 | 1-phase | 45 | 120 |
LVT15/11 | 1100 | 230 | 340 | 170 | 15 | 415 | 585 | 845 | 3.5 | 1-phase | 55 | 120 |